{"id":8313,"date":"2026-03-11T12:36:57","date_gmt":"2026-03-11T12:36:57","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/35-10-kv-duklo-substation-built-on-the-distribution-network\/"},"modified":"2026-10-08T21:22:06","modified_gmt":"2026-10-08T21:22:06","slug":"35-10-kv-duklo-substation-built-on-the-distribution-network","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/","title":{"rendered":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Following the issuance of the operating permit by the relevant ministry, based on the technical inspection report prepared by the Institute for Development and Research in the Field of Occupational Safety d.o.o., Podgorica, the newly built 35\/10 kV \u201cDuklo\u201d substation is being energised and gradually integrated into the 10 kV network.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-1024x768.jpeg\" alt=\"\" class=\"wp-image-7025\" srcset=\"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-1024x768.jpeg 1024w, https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-300x225.jpeg 300w, https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-768x576.jpeg 768w, https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-1536x1152.jpeg 1536w, https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4016-2048x1536.jpeg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p class=\"wp-block-paragraph\">In accordance with the spatial and urban development plan of the Municipality of Nik\u0161i\u0107, the new 35\/10 kV \u201cDuklo\u201d substation has been built in the former industrial centre, right next to the old facility of the same name, RP \u201cDuklo\u201d, which dates back to the 1980s, as do all the other 35\/10 kV substations in the area. This investment, worth around EUR 2.5 million, will significantly improve the energy infrastructure of the entire Region 1, particularly in the Municipality of Nik\u0161i\u0107, with the aim of enhancing reliability and ensuring a safe and high-quality electricity supply for customers in the area.<\/p>\n\n<p class=\"wp-block-paragraph\">As the city of Nik\u0161i\u0107 developed, the number of customers grew, and so did electricity consumption. As the responsible distribution system operator, this made us aware of the need to build a new substation. Construction work on the substation began in 2023. The project also involved integrating it into the 35 kV and 10 kV networks, entailing extensive works and a lengthy, complex permitting process. As a result, although the facility and its primary electrical equipment were completed at the end of 2024, it is only now being commissioned and integrated into the 10 kV network.<\/p>\n\n<p class=\"wp-block-paragraph\">The operating room houses a 35 kV switchgear assembly consisting of seven cells with a single busbar system, type UniGear ZS2, and a 10 kV switchgear assembly consisting of 20 cells, type ZS8.4, manufactured by the renowned global company ABB. The 35\/10 kV transformers, rated at 8 MVA, are manufactured by ETRA of Slovenia.<\/p>\n\n<p class=\"wp-block-paragraph\">Construction of this facility is crucial to meeting the current needs of the city of Nik\u0161i\u0107, while also opening up opportunities for the city\u2019s continued development. The new 35\/10 kV \u201cDuklo\u201d substation will take over the now considerable load of Gornje Polje, Glibavac, Brezovik, the Mali Brezovik barracks, Vidrovan, \u0160ipa\u010dno, \u0160ume, Milo\u010dani, Jasenovo Polje, \u0106emenci, Dragova Luka, Grebice, Ko\u010dani, Rastoci, the main water supply pumps of Vodovod Nik\u0161i\u0107, the city dairy, the \u0160IK Javorak Industrial Zone, etc., which were previously supplied from the 35\/10 kV \u201cBistrica\u201d substation. As can be seen, the construction of the new substation will relieve the 35\/10 kV \u201cBistrica\u201d substation, freeing up capacity to serve other parts of the city and providing them with a more stable electricity supply.<\/p>\n\n<p class=\"wp-block-paragraph\">It is also important to note that a 35 kV cell remains available at this substation, allowing the 35 kV network to be extended in the Uzdomir area and the hinterland of Krupac and Viro\u0161tak, either to meet future demand or to connect renewable energy sources.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following the issuance of the operating permit by the relevant ministry, based on the technical inspection report prepared by the Institute for Development and Research in the Field of Occupational Safety d.o.o., Podgorica, the newly built 35\/10 kV \u201cDuklo\u201d substation is being energised and gradually integrated into the 10 kV network. In accordance with the<\/p>\n","protected":false},"author":3,"featured_media":7024,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-8313","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"Following the issuance of the operating permit by the relevant ministry, based on the technical inspection report prepared by the Institute for Development and Research in the Field of Occupational Safety d.o.o., Podgorica, the newly built 35\/10 kV \u201cDuklo\u201d substation is being energised and gradually integrated into the 10 kV network. In accordance with the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-11T12:36:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T21:22:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kristina Bajic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kristina Bajic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/\"},\"author\":{\"name\":\"Kristina Bajic\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/4c600c9b62201b4711ee0aaa33cb8ea8\"},\"headline\":\"35\\\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK\",\"datePublished\":\"2026-03-11T12:36:57+00:00\",\"dateModified\":\"2026-10-08T21:22:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/\"},\"wordCount\":469,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_4036-scaled.jpeg\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/\",\"name\":\"35\\\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_4036-scaled.jpeg\",\"datePublished\":\"2026-03-11T12:36:57+00:00\",\"dateModified\":\"2026-10-08T21:22:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_4036-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/IMG_4036-scaled.jpeg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/35-10-kv-duklo-substation-built-on-the-distribution-network\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"35\\\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/4c600c9b62201b4711ee0aaa33cb8ea8\",\"name\":\"Kristina Bajic\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g\",\"caption\":\"Kristina Bajic\"},\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/cedis1\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/","og_locale":"en_US","og_type":"article","og_title":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"Following the issuance of the operating permit by the relevant ministry, based on the technical inspection report prepared by the Institute for Development and Research in the Field of Occupational Safety d.o.o., Podgorica, the newly built 35\/10 kV \u201cDuklo\u201d substation is being energised and gradually integrated into the 10 kV network. In accordance with the","og_url":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2026-03-11T12:36:57+00:00","article_modified_time":"2026-10-08T21:22:06+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg","type":"image\/jpeg"}],"author":"Kristina Bajic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kristina Bajic","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/"},"author":{"name":"Kristina Bajic","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/4c600c9b62201b4711ee0aaa33cb8ea8"},"headline":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK","datePublished":"2026-03-11T12:36:57+00:00","dateModified":"2026-10-08T21:22:06+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/"},"wordCount":469,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/","url":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/","name":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg","datePublished":"2026-03-11T12:36:57+00:00","dateModified":"2026-10-08T21:22:06+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2026\/03\/IMG_4036-scaled.jpeg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/35-10-kv-duklo-substation-built-on-the-distribution-network\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"35\/10 kV \u201cDUKLO\u201d SUBSTATION BUILT ON THE DISTRIBUTION NETWORK"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/4c600c9b62201b4711ee0aaa33cb8ea8","name":"Kristina Bajic","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1631e4ca4368b238bcfe6e34782891f6d6476d727561e8e5b6df145935347a4e?s=96&d=mm&r=g","caption":"Kristina Bajic"},"url":"https:\/\/cedis.me\/en\/author\/cedis1\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=8313"}],"version-history":[{"count":1,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8313\/revisions"}],"predecessor-version":[{"id":8314,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8313\/revisions\/8314"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/7024"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=8313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=8313"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=8313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}