{"id":8465,"date":"2025-06-01T07:06:59","date_gmt":"2025-06-01T07:06:59","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/network-preparation-for-the-season-begins\/"},"modified":"2026-10-08T21:35:01","modified_gmt":"2026-10-08T21:35:01","slug":"network-preparation-for-the-season-begins","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/","title":{"rendered":"Network Preparation for the Season Begins"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">To ensure adequate preparation for the start of the summer tourist season, activities are being stepped up to prepare the electricity network for different operating conditions and the increased number of customers expected during the summer period.<\/p>\n\n<p class=\"wp-block-paragraph\">Preventive maintenance of electricity facilities is carried out in accordance with the adopted Maintenance Plan for 2025, which requires the full engagement of employees in the network maintenance departments to ensure that all planned activities are completed within the specified deadlines. Accordingly, work to implement the Preventive Maintenance Plan began immediately after the New Year and Christmas holidays, alongside a number of emergency tasks that form part of operational activities.<\/p>\n\n<p class=\"wp-block-paragraph\">\u201cAlthough the scope of work involves inspecting a large number of electricity facilities, all planned activities at tourist destinations will be completed by the start of the summer season. The first facility addressed was the 35\/10 kV substation \u2018Topolica\u2019, where old low-oil circuit breakers were replaced with highly reliable vacuum circuit breakers. In February, work to replace circuit breakers continued at the 10 kV switchgear in the \u2018Dobrota\u2019 substation in Kotor, the \u2018Sutomore\u2019 substation in Bar and the \u2018Topla\u2019 substation in Herceg Novi.<\/p>\n\n<p class=\"wp-block-paragraph\">During March and April, equipment inspections and overhauls are being carried out at 35\/10 kV substations in the areas of Herceg Novi, Tivat, Kotor, Budva, Bar and Ulcinj,\u201d said Sreten Krstaji\u0107, Head of the 20 kV and 35 kV Maintenance Department.<\/p>\n\n<p class=\"wp-block-paragraph\">The plan also includes completing equipment inspections at the 35 kV switchgear in seven 110\/35 kV substations\u2014\u2018Herceg Novi\u2019, \u2018Tivat\u2019, \u2018Lastva\u2019, \u2018Budva\u2019, \u2018Virpazar\u2019, \u2018Bar\u2019 and \u2018Ulcinj\u2019\u2014by the start of the summer season, as well as inspecting and overhauling equipment in 35\/0.4 kV substations in the Municipality of Bar (\u2018Sotoni\u0107i\u2019, \u2018Br\u010deli 1\u2019, \u2018Br\u010deli 2\u2019, \u2018Bukovik\u2019 and \u2018Bijele Poljane\u2019).<\/p>\n\n<p class=\"wp-block-paragraph\">\u201cAlthough field activities, which involve visiting and inspecting all 35 kV overhead lines in the coastal municipalities, depend on weather conditions, there is no doubt that the planned work to prepare the 35 kV overhead network for the summer tourist season will be completed. Immediately before summer and throughout the season, teams will inspect the electricity facilities under the remit of the 20 kV and 35 kV Maintenance Department and carry out thermal imaging inspections of equipment, while providing 24-hour operational-level on-call coverage,\u201d Krstaji\u0107 noted.<\/p>\n\n<p class=\"wp-block-paragraph\">In addition to regular and planned maintenance of electricity facilities, teams from this department must also respond when network changes cause faults that require urgent repair. They also play an active role in implementing investment projects.<\/p>\n\n<p class=\"wp-block-paragraph\">Speaking about investment activities, Acting Head of the Investment Department Tatjana \u0160aranovi\u0107 said that intensive work is under way to improve efficiency and increase the reliability of network capacity in tourist centres.<\/p>\n\n<p class=\"wp-block-paragraph\">Construction work is under way in the municipalities of Bar, Budva and Ulcinj on six 10\/0.4 kV substations and six cable lines at the same voltage level, as well as the reconstruction of ten existing substations. The planned investments are worth approximately one million euros. Further, in Region 5, which covers Herceg Novi, Kotor and Tivat, work is under way on the construction of six substations, one of which is of particular importance. This is the 35\/10 kV \u2018Grbalj 2\u2019 substation. Work began last year, and its completion will contribute to a better and more reliable electricity supply for customers in the Grbalj area, improve conditions for economic development in the area and part of the Municipality of Kotor by enabling new customers to connect, and ensure a secure, reliable and high-quality electricity supply for existing customers,\u201d \u0160aranovi\u0107 said.<\/p>\n\n<p class=\"wp-block-paragraph\">In addition to building new substations, we expect work to be completed by the end of June on the reconstruction of 21 10\/0.4 kV substations and low-voltage switchgear, as well as transformer replacements. In addition to the 35\/10 kV \u2018Grbalj 2\u2019 substation, with a total value of almost two million euros, the planned activities in this part of the coast are worth more than one and a half million euros.<\/p>\n\n<p class=\"wp-block-paragraph\">Work is progressing according to schedule, and all activities under way are expected to be completed by the start of the summer tourist season, more precisely by the end of June this year.<\/p>\n\n<p class=\"wp-block-paragraph\">In addition to the investments listed above, which are expected to be completed by the start of the summer tourist season, an intensive investment cycle in the electricity distribution network has been launched. Its completion is expected to bring several benefits: increased capacity to connect new customers, improved voltage conditions, greater supply reliability and security, and reduced electricity losses.<\/p>\n\n<p class=\"wp-block-paragraph\">The intensive development of coastal tourist centres, particularly in the municipalities of Bar, Budva and Tivat, means that new supply points will be the main challenge in the future. Their construction must be carried out jointly with CGES. CEDIS has included a new 35 kV switchgear at the planned 110\/35 kV Buljarica (Kufin) substation in its investment plans. Without its construction, the development of electricity infrastructure in the Municipality of Bar will not be possible in the near future. For the Municipality of Budva, CEDIS and CGES have included the construction of the 110\/10 kV Be\u010di\u0107i substation in their investment plans. This would provide a new key supply point, essential for the city\u2019s further development. The electricity supply problem for customers in the Municipality of Tivat would be significantly alleviated by building the 35\/10 kV Tivat 3 substation.<\/p>\n\n<p class=\"wp-block-paragraph\">The main obstacle to implementing these investments is the lack of spatial and urban planning documentation and lengthy procedures for resolving property rights issues. CEDIS cannot overcome these obstacles without recognition of their importance and the active involvement of a larger number of competent state institutions.<\/p>\n\n<p class=\"wp-block-paragraph\">As can be seen, in line with its business policy, CEDIS is investing significant funds in network reconstruction. To better prepare for the summer tourist season, the Maintenance Department has invested approximately \u20ac230,000 in Region 4, which includes Bar, Ulcinj and Budva. Work is being carried out on ten pole-mounted substations and 17 low-voltage networks in this part of the Montenegrin coast. All civil engineering work on the 10 kV \u2018Ga\u010d\u2013Sv. \u0110or\u0111e\u2019 overhead line has been completed, with approximately \u20ac455,000 invested.<\/p>\n\n<p class=\"wp-block-paragraph\">Approximately \u20ac140,000 has also been invested in Region 5, which covers Tivat, Kotor and Herceg Novi. Civil engineering work on the 10 kV \u2018Grbalj 2\u2019 overhead line is under way, and 70% of the work planned for this year has been completed to date, at a cost of approximately \u20ac70,000.<\/p>\n\n<p class=\"wp-block-paragraph\">Maintaining and developing energy infrastructure in municipalities that offer tourist services is one of the prerequisites for improving the business environment for the tourism and hospitality industry. That is why CEDIS plays an active role every year in preparing and creating the conditions needed to support it.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To ensure adequate preparation for the start of the summer tourist season, activities are being stepped up to prepare the electricity network for different operating conditions and the increased number of customers expected during the summer period. Preventive maintenance of electricity facilities is carried out in accordance with the adopted Maintenance Plan for 2025, which<\/p>\n","protected":false},"author":2,"featured_media":6254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-8465","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"To ensure adequate preparation for the start of the summer tourist season, activities are being stepped up to prepare the electricity network for different operating conditions and the increased number of customers expected during the summer period. Preventive maintenance of electricity facilities is carried out in accordance with the adopted Maintenance Plan for 2025, which\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-01T07:06:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T21:35:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1150\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Podrska Podrska\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Podrska Podrska\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/\"},\"author\":{\"name\":\"Podrska Podrska\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/bf882d286f7503eb0aab7ce7957606bd\"},\"headline\":\"Network Preparation for the Season Begins\",\"datePublished\":\"2025-06-01T07:06:59+00:00\",\"dateModified\":\"2026-10-08T21:35:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/\"},\"wordCount\":1080,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cedis_106-2048x1150-1.jpg\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/\",\"name\":\"Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cedis_106-2048x1150-1.jpg\",\"datePublished\":\"2025-06-01T07:06:59+00:00\",\"dateModified\":\"2026-10-08T21:35:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cedis_106-2048x1150-1.jpg\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/cedis_106-2048x1150-1.jpg\",\"width\":2048,\"height\":1150},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-preparation-for-the-season-begins\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Network Preparation for the Season Begins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/bf882d286f7503eb0aab7ce7957606bd\",\"name\":\"Podrska Podrska\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g\",\"caption\":\"Podrska Podrska\"},\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/podrska\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/","og_locale":"en_US","og_type":"article","og_title":"Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"To ensure adequate preparation for the start of the summer tourist season, activities are being stepped up to prepare the electricity network for different operating conditions and the increased number of customers expected during the summer period. Preventive maintenance of electricity facilities is carried out in accordance with the adopted Maintenance Plan for 2025, which","og_url":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2025-06-01T07:06:59+00:00","article_modified_time":"2026-10-08T21:35:01+00:00","og_image":[{"width":2048,"height":1150,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg","type":"image\/jpeg"}],"author":"Podrska Podrska","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Podrska Podrska","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/"},"author":{"name":"Podrska Podrska","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/bf882d286f7503eb0aab7ce7957606bd"},"headline":"Network Preparation for the Season Begins","datePublished":"2025-06-01T07:06:59+00:00","dateModified":"2026-10-08T21:35:01+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/"},"wordCount":1080,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/","url":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/","name":"Network Preparation for the Season Begins - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg","datePublished":"2025-06-01T07:06:59+00:00","dateModified":"2026-10-08T21:35:01+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/06\/cedis_106-2048x1150-1.jpg","width":2048,"height":1150},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/network-preparation-for-the-season-begins\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"Network Preparation for the Season Begins"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/bf882d286f7503eb0aab7ce7957606bd","name":"Podrska Podrska","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/978f7cbc2720a45729be7a65a44093d3f23756ef4b74b92e2145d30c834a6ebd?s=96&d=mm&r=g","caption":"Podrska Podrska"},"url":"https:\/\/cedis.me\/en\/author\/podrska\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=8465"}],"version-history":[{"count":1,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8465\/revisions"}],"predecessor-version":[{"id":8466,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8465\/revisions\/8466"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/6254"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=8465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=8465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=8465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}