{"id":8827,"date":"2024-07-08T09:09:18","date_gmt":"2024-07-08T09:09:18","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/"},"modified":"2026-10-09T00:00:57","modified_gmt":"2026-10-09T00:00:57","slug":"by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/","title":{"rendered":"By the end of the year, CEDIS will have around eighty thousand meters"},"content":{"rendered":"<p>Despite the difficulties it has encountered with tender procedures, bidders\u2019 complaints, and the State Commission for the Control of Public Procurement Procedures exceeding statutory deadlines, the Montenegrin Electricity Distribution System has managed to secure a significant number of new meters.<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-16871\" src=\"https:\/\/cedis.me\/wp-content\/uploads\/2024\/07\/GOR_4813.jpg\" alt=\"\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Following the completion of the tender procedures, around eighty thousand new metering devices will be delivered to CEDIS by the end of this year under these contracts.<\/p>\n<p>At the beginning of March, seven thousand meters were procured through the tender \u201cMetering Equipment for Improving the Metering System \u2013 Lot 2 \u2013 Meters for Specific Metering Points\u201d of 6 May 2022. In the meantime, the tender procedure \u201cMeters and Metering Equipment for the Maintenance of Metering Points in the Existing AMM System\u201d of 29 December 2022 has also been completed, and the delivery of a further fifteen thousand meters is expected in the autumn. A further eight thousand meters have been delivered under the tender \u201cProcurement of Metering Equipment for the Needs of the Metering Sector\u201d of 27 December 2022.<\/p>\n<p>&nbsp;<\/p>\n<p>To ensure transparent and accurate information for the public, we emphasise that the Commission for the Control of Public Procurement Procedures issued decisions in proceedings No. 60\/22 of 6 May 2022 for the procurement of goods \u2013 Metering Equipment for Improving the Metering System \u2013 Lot 1 \u2013 G3 PLC Meters and Equipment, and No. 59\/22 of 6 May 2022 for the procurement of goods \u2013 Metering Equipment for New Consumers, Producers and Transformer Stations. The complaints submitted by the bidder consortium \u201cINFINITY ITSS AND ENERGY\u201d LLC Podgorica \u2013 \u201cPROINTER ITSS\u201d d.o.o. Banja Luka \u2013 a member of Infinity International Group were dismissed as entirely unfounded. Accordingly, once these two contracts are concluded, more than fifty thousand new meters will be delivered to the Montenegrin Electricity Distribution System.<\/p>\n<p>We emphasise that CEDIS, as the Contracting Authority, respected the powers of the second-instance body and did not disclose facts relevant to the public procurement procedures themselves, despite untrue claims published in the media throughout the appeal proceedings.<\/p>\n<p>&nbsp;<\/p>\n<p>In previous statements, Executive Director Vladimir Ivanovi\u0107 noted that the tender procedures had slowed down their implementation, but that once they were completed, our company would have more than eighty thousand meters.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-16605\" src=\"https:\/\/cedis.me\/wp-content\/uploads\/2024\/04\/Brifing-za-novinare-6-scaled.jpg\" alt=\"\" \/><\/p>\n<p>\u201cMany controversies have surrounded the tender procedures for the procurement of meters, dating back to an earlier period. What matters most, however, is that there were no complaints about the technical specifications for the meters, except in the procurement of goods \u2013 Metering Equipment for Improving the Metering System \u2013 Lot 1 \u2013 G3 PLC Meters and Equipment, and the procurement of goods \u2013 Metering Equipment for New Consumers, Producers and Transformer Stations, where the Commission ruled in favour of CEDIS. All meters are being procured from the companies Somborelektro and Mezon,\u201d Ivanovi\u0107 noted.<\/p>\n<p>&nbsp;<\/p>\n<p>We would like to inform the public that since 2021, CEDIS has launched as many as seven open tender procedures for the procurement of metering equipment, and that the contracted deliveries will provide CEDIS with metering equipment worth more than twelve million euros.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despite the difficulties it has encountered with tender procedures, bidders\u2019 complaints, and the State Commission for the Control of Public Procurement Procedures exceeding statutory deadlines, the Montenegrin Electricity Distribution System has managed to secure a significant number of new meters. &nbsp; &nbsp; Following the completion of the tender procedures, around eighty thousand new metering devices<\/p>\n","protected":false},"author":1,"featured_media":945,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-8827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"Despite the difficulties it has encountered with tender procedures, bidders\u2019 complaints, and the State Commission for the Control of Public Procurement Procedures exceeding statutory deadlines, the Montenegrin Electricity Distribution System has managed to secure a significant number of new meters. &nbsp; &nbsp; Following the completion of the tender procedures, around eighty thousand new metering devices\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-08T09:09:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T00:00:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1709\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"By the end of the year, CEDIS will have around eighty thousand meters\",\"datePublished\":\"2024-07-08T09:09:18+00:00\",\"dateModified\":\"2026-10-09T00:00:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/\"},\"wordCount\":497,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Brifing-za-novinare-6-scaled-1.jpg\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/\",\"name\":\"By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Brifing-za-novinare-6-scaled-1.jpg\",\"datePublished\":\"2024-07-08T09:09:18+00:00\",\"dateModified\":\"2026-10-09T00:00:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Brifing-za-novinare-6-scaled-1.jpg\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Brifing-za-novinare-6-scaled-1.jpg\",\"width\":2560,\"height\":1709},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"By the end of the year, CEDIS will have around eighty thousand meters\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/","og_locale":"en_US","og_type":"article","og_title":"By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"Despite the difficulties it has encountered with tender procedures, bidders\u2019 complaints, and the State Commission for the Control of Public Procurement Procedures exceeding statutory deadlines, the Montenegrin Electricity Distribution System has managed to secure a significant number of new meters. &nbsp; &nbsp; Following the completion of the tender procedures, around eighty thousand new metering devices","og_url":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2024-07-08T09:09:18+00:00","article_modified_time":"2026-10-09T00:00:57+00:00","og_image":[{"width":2560,"height":1709,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg","type":"image\/jpeg"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"By the end of the year, CEDIS will have around eighty thousand meters","datePublished":"2024-07-08T09:09:18+00:00","dateModified":"2026-10-09T00:00:57+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/"},"wordCount":497,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/","url":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/","name":"By the end of the year, CEDIS will have around eighty thousand meters - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg","datePublished":"2024-07-08T09:09:18+00:00","dateModified":"2026-10-09T00:00:57+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Brifing-za-novinare-6-scaled-1.jpg","width":2560,"height":1709},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/by-the-end-of-the-year-cedis-will-have-around-eighty-thousand-meters\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"By the end of the year, CEDIS will have around eighty thousand meters"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=8827"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8827\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/945"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=8827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=8827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=8827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}