{"id":8913,"date":"2023-03-27T08:40:52","date_gmt":"2023-03-27T08:40:52","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/recloser-installation-worth-800000-euros-underway-in-february\/"},"modified":"2026-10-09T00:11:58","modified_gmt":"2026-10-09T00:11:58","slug":"recloser-installation-worth-800000-euros-underway-in-february","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/","title":{"rendered":"Recloser installation worth 800,000 euros underway in February"},"content":{"rendered":"<p><u>Last month, work was completed on the installation of reclosers and disconnectors on five 10 kV overhead lines in the municipality of Bijelo Polje (\u201cToma\u0161evo\u201d, \u201cGubava\u010d\u201d, \u201cIvanje\u201d, \u201cSr\u0111evac\u201d and \u201cRasovo\u201d). CEDIS allocated around 500,000 euros for this investment. In addition to the municipality of Bijelo Polje, work is also underway in Bar to install reclosers on three 10 kV overhead lines (\u201cDupilo\u201d, \u201cOstros\u201d and \u201cMrkojevi\u0107i\u201d), for which around 300,000 euros has been earmarked.<\/u> In February, work was also completed on the reconstruction of the 35 kV \u201cBuljarica &#8211; Virpazar &#8211; Podgor\u201d overhead line, as well as the procurement of two transformers for the \u201cIgalo\u201d 35\/10 kV substation, for which around 430,000 euros was allocated. Work is also underway on the construction of two 10\/0.4 kV substations in Podgorica, with a planned value of around 120,000 euros.<\/p>\n<p>In February, electricity distribution system customers took a total of <strong>266,400,324 kWh <\/strong><strong>of electricity<\/strong>, around 4 per cent less than the consumption recorded in January and 10 per cent more than the energy taken in February of the previous year. The largest share of electricity, around 39 per cent, was distributed to customers in the areas of Podgorica, Danilovgrad and Cetinje (Region 2).<\/p>\n<p>A total of <strong>407,159<\/strong> <strong>meters<\/strong> were read, or <strong>93 per cent<\/strong> of the total (unread metering points are located in buildings that are not permanently occupied). The meter reading rate at metering points equipped with new electronic meters is 99 per cent.<\/p>\n<p>In February, Maintenance Sector teams carried out <strong>2,059 field interventions at the 10\/0.4 kV level.<\/strong> The value of work on the maintenance of power facilities (10\/0.4 kV) amounted to around <strong>193,000 euros.<\/strong><\/p>\n<p>A total of <strong>686 <\/strong><strong>new customers<\/strong> were connected to the distribution network in February.<\/p>\n<p>Last month, 35 new electronic meters were installed in Montenegro. The total number of metering points in Montenegro equipped with remotely operated electronic meters is around 340,000, covering around 80 per cent of electricity consumption.<\/p>\n<p>CEDIS\u2019s core activity is the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 436,000 customers across Montenegro.<\/p>\n<p><a href=\"https:\/\/cedis.me\/wp-content\/uploads\/2023\/03\/Infografik-februar-2023.png\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-14891\" src=\"https:\/\/cedis.me\/wp-content\/uploads\/2023\/03\/Infografik-februar-2023.png\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last month, work was completed on the installation of reclosers and disconnectors on five 10 kV overhead lines in the municipality of Bijelo Polje (\u201cToma\u0161evo\u201d, \u201cGubava\u010d\u201d, \u201cIvanje\u201d, \u201cSr\u0111evac\u201d and \u201cRasovo\u201d). CEDIS allocated around 500,000 euros for this investment. In addition to the municipality of Bijelo Polje, work is also underway in Bar to install reclosers<\/p>\n","protected":false},"author":1,"featured_media":1085,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-8913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"Last month, work was completed on the installation of reclosers and disconnectors on five 10 kV overhead lines in the municipality of Bijelo Polje (\u201cToma\u0161evo\u201d, \u201cGubava\u010d\u201d, \u201cIvanje\u201d, \u201cSr\u0111evac\u201d and \u201cRasovo\u201d). CEDIS allocated around 500,000 euros for this investment. In addition to the municipality of Bijelo Polje, work is also underway in Bar to install reclosers\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-27T08:40:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T00:11:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"Recloser installation worth 800,000 euros underway in February\",\"datePublished\":\"2023-03-27T08:40:52+00:00\",\"dateModified\":\"2026-10-09T00:11:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/\"},\"wordCount\":335,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Infografik-februar-2023.png\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/\",\"name\":\"Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Infografik-februar-2023.png\",\"datePublished\":\"2023-03-27T08:40:52+00:00\",\"dateModified\":\"2026-10-09T00:11:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Infografik-februar-2023.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Infografik-februar-2023.png\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/recloser-installation-worth-800000-euros-underway-in-february\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Recloser installation worth 800,000 euros underway in February\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/","og_locale":"en_US","og_type":"article","og_title":"Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"Last month, work was completed on the installation of reclosers and disconnectors on five 10 kV overhead lines in the municipality of Bijelo Polje (\u201cToma\u0161evo\u201d, \u201cGubava\u010d\u201d, \u201cIvanje\u201d, \u201cSr\u0111evac\u201d and \u201cRasovo\u201d). CEDIS allocated around 500,000 euros for this investment. In addition to the municipality of Bijelo Polje, work is also underway in Bar to install reclosers","og_url":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2023-03-27T08:40:52+00:00","article_modified_time":"2026-10-09T00:11:58+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png","type":"image\/png"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"Recloser installation worth 800,000 euros underway in February","datePublished":"2023-03-27T08:40:52+00:00","dateModified":"2026-10-09T00:11:58+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/"},"wordCount":335,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/","url":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/","name":"Recloser installation worth 800,000 euros underway in February - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png","datePublished":"2023-03-27T08:40:52+00:00","dateModified":"2026-10-09T00:11:58+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Infografik-februar-2023.png","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/recloser-installation-worth-800000-euros-underway-in-february\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"Recloser installation worth 800,000 euros underway in February"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=8913"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8913\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/1085"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=8913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=8913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=8913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}