{"id":8960,"date":"2022-10-25T11:10:00","date_gmt":"2022-10-25T11:10:00","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/around-eur-200000-invested-in-network-maintenance-in-september\/"},"modified":"2026-10-09T00:18:37","modified_gmt":"2026-10-09T00:18:37","slug":"around-eur-200000-invested-in-network-maintenance-in-september","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/","title":{"rendered":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER"},"content":{"rendered":"<p>In September, users of the electricity distribution system consumed a total of <strong>204,711,089<\/strong><strong> kWh <\/strong>of electricity, seven per cent more than during the same period of the previous year. The largest share of electricity, around 35 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi and Cetinje (Region 2).<\/p>\n<p>A total of <strong>402,675 meters, or 94 per cent<\/strong> of all meters, were read (unread metering points are located in buildings that are not permanently occupied). The meter-reading rate at metering points equipped with new electronic meters is 99 per cent.<\/p>\n<p>In September, the Maintenance Sector teams carried out <strong>1,844<\/strong><strong> field interventions.<\/strong> The value of works to maintain electricity infrastructure facilities amounted to around <strong>199<\/strong><strong> thousand euros<\/strong><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone  wp-image-13926\" src=\"http:\/\/cedis.me\/wp-content\/uploads\/2022\/10\/infografik-SEPTEMBAR-2022-300x225.png\" alt=\"\" width=\"568\" height=\"426\" \/><strong>.<\/strong><\/p>\n<p>A total of <strong>396 <\/strong><strong>new users<\/strong> were connected to the distribution network in September.<\/p>\n<p>In September, projects worth EUR 660,000 were completed on the primary network, with the largest share of funds allocated to equipment and works at the 35\/10 kV \u201cGorica A\u201d substation. Preparations are also under way for works worth EUR 190,000 to install two new 8 MVA transformers at the 35\/10 kV \u201cIgalo\u201d substation. Works are also under way to reconstruct the 35 kV \u201cGuke-Mataruge\u201d overhead line, for which CEDIS is allocating around EUR 500,000. Once completed, the network quality and security of supply for a large part of the Pljevlja municipality will be significantly improved. Works have also been completed on the construction of the 10\/0.4 kV \u201cNo. 1 &#8211; New\u201d substation (under the \u201cKonik &#8211; Stari Aerodrom III\u201d DUP) and the relocation of the 10\/0.4 kV \u201cIV (Stanovi-New)\u201d substation, with its integration into the network in \u017dabljak. The value of these projects is around EUR 235,000.<\/p>\n<p>Last month, 421 new electronic meters were installed across Montenegro. The total number of metering points in Montenegro equipped with remotely managed electronic meters is around 339,000, covering approximately 80 per cent of consumption.<\/p>\n<p>CEDIS\u2019s core activities are the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 429,000 users across Montenegro.<\/p>\n<p><strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0<\/strong><strong>\u00a0Corporate Communications Service<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In September, users of the electricity distribution system consumed a total of 204,711,089 kWh of electricity, seven per cent more than during the same period of the previous year. The largest share of electricity, around 35 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi and Cetinje (Region 2). A total<\/p>\n","protected":false},"author":1,"featured_media":1168,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-8960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"In September, users of the electricity distribution system consumed a total of 204,711,089 kWh of electricity, seven per cent more than during the same period of the previous year. The largest share of electricity, around 35 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi and Cetinje (Region 2). A total\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-25T11:10:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T00:18:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER\",\"datePublished\":\"2022-10-25T11:10:00+00:00\",\"dateModified\":\"2026-10-09T00:18:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/\"},\"wordCount\":331,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/infografik-SEPTEMBAR-2022.png\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/\",\"name\":\"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/infografik-SEPTEMBAR-2022.png\",\"datePublished\":\"2022-10-25T11:10:00+00:00\",\"dateModified\":\"2026-10-09T00:18:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/infografik-SEPTEMBAR-2022.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/infografik-SEPTEMBAR-2022.png\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-eur-200000-invested-in-network-maintenance-in-september\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/","og_locale":"en_US","og_type":"article","og_title":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"In September, users of the electricity distribution system consumed a total of 204,711,089 kWh of electricity, seven per cent more than during the same period of the previous year. The largest share of electricity, around 35 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi and Cetinje (Region 2). A total","og_url":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2022-10-25T11:10:00+00:00","article_modified_time":"2026-10-09T00:18:37+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png","type":"image\/png"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER","datePublished":"2022-10-25T11:10:00+00:00","dateModified":"2026-10-09T00:18:37+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/"},"wordCount":331,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/","url":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/","name":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png","datePublished":"2022-10-25T11:10:00+00:00","dateModified":"2026-10-09T00:18:37+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/infografik-SEPTEMBAR-2022.png","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/around-eur-200000-invested-in-network-maintenance-in-september\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"AROUND EUR 200,000 INVESTED IN NETWORK MAINTENANCE IN SEPTEMBER"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=8960"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/8960\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/1168"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=8960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=8960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=8960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}