{"id":9144,"date":"2020-12-21T12:36:59","date_gmt":"2020-12-21T12:36:59","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/around-e420000-allocated-for-network-maintenance\/"},"modified":"2026-10-09T08:36:08","modified_gmt":"2026-10-09T08:36:08","slug":"around-e420000-allocated-for-network-maintenance","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/","title":{"rendered":"Around \u20ac420,000 allocated for network maintenance"},"content":{"rendered":"<p>In November, users of the electricity distribution system consumed a total of <strong>209,714,152<\/strong> <strong>kWh of electricity<\/strong>, around <strong>three<\/strong><strong> per cent mo<\/strong><strong>re<\/strong> than in the same period last year. The largest amount of electricity, around 41 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2).<\/p>\n<p>A total of <strong>385,725 meters<\/strong> were read, or <strong>94 per cent<\/strong> of the total (unread metering points are located in buildings that are not permanently occupied). The meter reading rate at metering points equipped with new electronic meters is 99 per cent.<\/p>\n<p>In November, the Maintenance Sector teams <strong>carried out 1,554 <\/strong><strong>field interventions.<\/strong> The value of work on the maintenance of electricity facilities amounted to<strong> \u20ac427,661.<\/strong><\/p>\n<p>Work is underway on 24 investment projects at the secondary network level, with a total value of around \u20ac1.9 million.<\/p>\n<p>A total of <strong>702 new users<\/strong> were connected to the distribution network in November.<\/p>\n<p>Last month, <strong>a total of<\/strong><strong> 1,357 new electronic meters were installed<\/strong> across Montenegro. Around 334,000 metering points in Montenegro are equipped with remotely managed electronic meters, covering approximately 80 per cent of electricity consumption.<\/p>\n<p>CEDIS\u2019s core activities are the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 410,000 users across Montenegro.<\/p>\n<p><a href=\"http:\/\/admin.cedis.me\/wp-content\/uploads\/2020\/12\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\"><img decoding=\"async\" class=\"alignnone size-large wp-image-10141\" src=\"http:\/\/admin.cedis.me\/wp-content\/uploads\/2020\/12\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic-1024x768.png\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In November, users of the electricity distribution system consumed a total of 209,714,152 kWh of electricity, around three per cent more than in the same period last year. The largest amount of electricity, around 41 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 385,725<\/p>\n","protected":false},"author":1,"featured_media":1584,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-9144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"In November, users of the electricity distribution system consumed a total of 209,714,152 kWh of electricity, around three per cent more than in the same period last year. The largest amount of electricity, around 41 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 385,725\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-21T12:36:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T08:36:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"Around \u20ac420,000 allocated for network maintenance\",\"datePublished\":\"2020-12-21T12:36:59+00:00\",\"dateModified\":\"2026-10-09T08:36:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/\"},\"wordCount\":205,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/\",\"name\":\"Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\",\"datePublished\":\"2020-12-21T12:36:59+00:00\",\"dateModified\":\"2026-10-09T08:36:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/around-e420000-allocated-for-network-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Around \u20ac420,000 allocated for network maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"In November, users of the electricity distribution system consumed a total of 209,714,152 kWh of electricity, around three per cent more than in the same period last year. The largest amount of electricity, around 41 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 385,725","og_url":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2020-12-21T12:36:59+00:00","article_modified_time":"2026-10-09T08:36:08+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png","type":"image\/png"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"Around \u20ac420,000 allocated for network maintenance","datePublished":"2020-12-21T12:36:59+00:00","dateModified":"2026-10-09T08:36:08+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/"},"wordCount":205,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/","url":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/","name":"Around \u20ac420,000 allocated for network maintenance - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png","datePublished":"2020-12-21T12:36:59+00:00","dateModified":"2026-10-09T08:36:08+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/10-Mjesecni-proracun-NOVEMBAR-2020-infographic.png","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/around-e420000-allocated-for-network-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"Around \u20ac420,000 allocated for network maintenance"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=9144"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9144\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/1584"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=9144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=9144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=9144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}