{"id":9162,"date":"2020-03-26T13:49:21","date_gmt":"2020-03-26T13:49:21","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/network-maintenance-in-february-cost-around-360-thousand-euros\/"},"modified":"2026-10-09T08:39:08","modified_gmt":"2026-10-09T08:39:08","slug":"network-maintenance-in-february-cost-around-360-thousand-euros","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/","title":{"rendered":"Network maintenance in February cost around 360 thousand euros"},"content":{"rendered":"<p>In February, users of the electricity distribution system consumed a total of <strong>234,253,963 kWh of electricity<\/strong>, around 11 per cent less than in January and at the same level as consumption recorded during the same period last year.<\/p>\n<p>The largest share of electricity, around 41 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2).<\/p>\n<p>A total of <strong>376,571 meters<\/strong> were read, or <strong>93 per cent<\/strong> of the total number (unread metering points are located in buildings that are not permanently occupied). The reading rate for metering points equipped with new electronic meters is 99 per cent.<\/p>\n<p>In February, the Maintenance Sector teams <strong>carried out 2,171 <\/strong><strong>field interventions.<\/strong> The value of maintenance works on power facilities amounted to around<strong> 367,831 thousand euros.<\/strong><\/p>\n<p>Last month, works worth 70 thousand euros to replace the low-voltage switchgear at the \u201cBim Slavija 1\u201d substation in Budva were completed. Documentation is also being prepared for the construction of the 35 kV \u201cHumci-Rijeka Crinojevi\u0107a\u201d overhead line, worth 126 thousand euros, as well as for the one-million-euro project to replace the 10 kV switchgear at the 35\/10 kV \u201cCentar\u201d substation. In February, preparations were also underway for documentation for the construction of 18 facilities at medium- and low-voltage levels, with a total value of over 850 thousand euros. The largest amount\u2014around 200 thousand euros\u2014will be allocated for the construction and integration of two transformer stations (10\/0.4 kV), \u201cBR.5-PMPG\u201d in Podgorica and \u201cDragovolji\u0107i 3\u201d in Nik\u0161i\u0107.<\/p>\n<p>In February, <strong>675<\/strong> <strong>new users were connected<\/strong> to the distribution network. Last month, <strong>a total of<\/strong><strong> 1,304 new electronic meters were installed<\/strong> across Montenegro. Around 323 thousand metering points in Montenegro are equipped with remotely managed electronic meters, covering around 79 per cent of the electricity consumption base.<\/p>\n<p>CEDIS\u2019s core activities are the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 405 thousand users across Montenegro.<\/p>\n<p><strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/strong><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter wp-image-8778 size-full\" src=\"http:\/\/admin.cedis.me\/wp-content\/uploads\/2020\/03\/Februar-2020-infographic.png\" alt=\"\" width=\"1200\" height=\"900\" \/><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In February, users of the electricity distribution system consumed a total of 234,253,963 kWh of electricity, around 11 per cent less than in January and at the same level as consumption recorded during the same period last year. The largest share of electricity, around 41 per cent, was distributed to users in the areas of<\/p>\n","protected":false},"author":1,"featured_media":1634,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-9162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"In February, users of the electricity distribution system consumed a total of 234,253,963 kWh of electricity, around 11 per cent less than in January and at the same level as consumption recorded during the same period last year. The largest share of electricity, around 41 per cent, was distributed to users in the areas of\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-26T13:49:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T08:39:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"Network maintenance in February cost around 360 thousand euros\",\"datePublished\":\"2020-03-26T13:49:21+00:00\",\"dateModified\":\"2026-10-09T08:39:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/\"},\"wordCount\":311,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Februar-2020-infographic-1.png\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/\",\"name\":\"Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Februar-2020-infographic-1.png\",\"datePublished\":\"2020-03-26T13:49:21+00:00\",\"dateModified\":\"2026-10-09T08:39:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Februar-2020-infographic-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Februar-2020-infographic-1.png\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/network-maintenance-in-february-cost-around-360-thousand-euros\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Network maintenance in February cost around 360 thousand euros\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/","og_locale":"en_US","og_type":"article","og_title":"Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"In February, users of the electricity distribution system consumed a total of 234,253,963 kWh of electricity, around 11 per cent less than in January and at the same level as consumption recorded during the same period last year. The largest share of electricity, around 41 per cent, was distributed to users in the areas of","og_url":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2020-03-26T13:49:21+00:00","article_modified_time":"2026-10-09T08:39:08+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png","type":"image\/png"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"Network maintenance in February cost around 360 thousand euros","datePublished":"2020-03-26T13:49:21+00:00","dateModified":"2026-10-09T08:39:08+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/"},"wordCount":311,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/","url":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/","name":"Network maintenance in February cost around 360 thousand euros - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png","datePublished":"2020-03-26T13:49:21+00:00","dateModified":"2026-10-09T08:39:08+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/Februar-2020-infographic-1.png","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/network-maintenance-in-february-cost-around-360-thousand-euros\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"Network maintenance in February cost around 360 thousand euros"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=9162"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/1634"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=9162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=9162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=9162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}