{"id":9288,"date":"2018-08-27T14:19:36","date_gmt":"2018-08-27T14:19:36","guid":{"rendered":"https:\/\/cedis.me\/uncategorized\/construction-of-facilities-worth-e720000-completed-in-july\/"},"modified":"2026-10-09T09:40:12","modified_gmt":"2026-10-09T09:40:12","slug":"construction-of-facilities-worth-e720000-completed-in-july","status":"publish","type":"post","link":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/","title":{"rendered":"Construction of facilities worth \u20ac720,000 completed in July"},"content":{"rendered":"<p>In July, users of the electricity distribution system consumed a total of <strong>237,767,310<\/strong> <strong>kWh of electricity<\/strong>, around 19 per cent more than in June.<\/p>\n<p>The largest amount of electricity, or almost 34 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2).<\/p>\n<p>A total of <strong>361,495 metering points<\/strong>, or <strong>92 per cent<\/strong> of the total, were read in the previous month (unread metering points are located in buildings that are not permanently occupied). The reading rate for metering points equipped with new electronic meters is 99 per cent.<\/p>\n<p>In July, the teams of the Maintenance Sector <strong>carried out field interventions 1,748<\/strong> <strong>times.<\/strong> The value of work on the maintenance of electricity infrastructure facilities amounted to around <strong>\u20ac330,000. <\/strong><\/p>\n<p>In the previous month, <strong>395<\/strong> <strong>power outages<\/strong> were announced across Montenegro due to planned network works<strong>. The average duration of outages was around 3.7 hours<\/strong>. We remind users that planned works are carried out to ensure a higher quality and more reliable electricity supply, and users are informed daily about the work schedules through the media, the website and the Facebook page.<\/p>\n<p>During July, work worth around \u20ac240,000 was completed to replace transformers at the 35\/10 kV substations \u201cGuke\u201d, \u201cRo\u017eaje\u201d, \u201cZeleni\u201d and \u201cPlu\u017eine\u201d. In the previous month, work was completed on the reconstruction of six substations in the Nik\u0161i\u0107 area, at a cost of \u20ac93,000. In the Ulcinj area, six projects worth around \u20ac350,000 were completed, of which the most financially demanding was the construction of a 10 kV cable line from the \u201cVelika Pla\u017ea 1\u201d substation to the \u201cB7\u201d substation. In Bar, the \u201cMikovi\u0107i\u201d substation was built at a cost of around \u20ac18,000, while in Podgorica, the necessary relocation of electricity infrastructure was completed due to the reconstruction of the Podgorica\u2013Petrovac main road, at a cost of \u20ac23,000.<\/p>\n<p>During July, <strong>2,595 new electronic meters were installed<\/strong> across Montenegro. The total number of metering points in Montenegro equipped with remotely controlled electronic meters is around 275,000, covering around 70 per cent of consumption.<\/p>\n<p><strong>810<\/strong> <strong>new users were connected<\/strong> to the distribution network during July.<\/p>\n<p>CEDIS\u2019s core business is the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 390,000 users across Montenegro.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/www.admin.cedis.me\/wp-content\/uploads\/2018\/08\/Infografik-Jul-2018.png\"><img decoding=\"async\" class=\"size-large wp-image-4996 aligncenter\" src=\"http:\/\/www.admin.cedis.me\/wp-content\/uploads\/2018\/08\/Infografik-Jul-2018-354x1024.png\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In July, users of the electricity distribution system consumed a total of 237,767,310 kWh of electricity, around 19 per cent more than in June. The largest amount of electricity, or almost 34 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 361,495 metering points, or<\/p>\n","protected":false},"author":1,"featured_media":1811,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[129],"tags":[],"class_list":["post-9288","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"og:description\" content=\"In July, users of the electricity distribution system consumed a total of 237,767,310 kWh of electricity, around 19 per cent more than in June. The largest amount of electricity, or almost 34 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 361,495 metering points, or\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/\" \/>\n<meta property=\"og:site_name\" content=\"CEDIS - Crnogorski elektrodistributivni sistem\" \/>\n<meta property=\"article:published_time\" content=\"2018-08-27T14:19:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T09:40:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"872\" \/>\n\t<meta property=\"og:image:height\" content=\"623\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"armin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"armin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/\"},\"author\":{\"name\":\"armin\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\"},\"headline\":\"Construction of facilities worth \u20ac720,000 completed in July\",\"datePublished\":\"2018-08-27T14:19:36+00:00\",\"dateModified\":\"2026-10-09T09:40:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/\"},\"wordCount\":366,\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/1-3.png\",\"articleSection\":[\"Latest News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/\",\"name\":\"Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/1-3.png\",\"datePublished\":\"2018-08-27T14:19:36+00:00\",\"dateModified\":\"2026-10-09T09:40:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/1-3.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/1-3.png\",\"width\":872,\"height\":623},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/latest-news\\\/construction-of-facilities-worth-e720000-completed-in-july\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cedis.me\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of facilities worth \u20ac720,000 completed in July\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"description\":\"Energija u srcu\",\"publisher\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cedis.me\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#organization\",\"name\":\"CEDIS - Crnogorski elektrodistributivni sistem\",\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"contentUrl\":\"https:\\\/\\\/cedis.me\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Untitled-1.png\",\"width\":1247,\"height\":492,\"caption\":\"CEDIS - Crnogorski elektrodistributivni sistem\"},\"image\":{\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cedis.me\\\/en\\\/#\\\/schema\\\/person\\\/8d6cf1ba961e9ef20e7a745f4ccc44e8\",\"name\":\"armin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g\",\"caption\":\"armin\"},\"sameAs\":[\"http:\\\/\\\/cedis.web\"],\"url\":\"https:\\\/\\\/cedis.me\\\/en\\\/author\\\/armin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/","og_locale":"en_US","og_type":"article","og_title":"Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem","og_description":"In July, users of the electricity distribution system consumed a total of 237,767,310 kWh of electricity, around 19 per cent more than in June. The largest amount of electricity, or almost 34 per cent, was distributed to users in the areas of Podgorica, Danilovgrad and Cetinje (Region 2). A total of 361,495 metering points, or","og_url":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/","og_site_name":"CEDIS - Crnogorski elektrodistributivni sistem","article_published_time":"2018-08-27T14:19:36+00:00","article_modified_time":"2026-10-09T09:40:12+00:00","og_image":[{"width":872,"height":623,"url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png","type":"image\/png"}],"author":"armin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"armin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#article","isPartOf":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/"},"author":{"name":"armin","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8"},"headline":"Construction of facilities worth \u20ac720,000 completed in July","datePublished":"2018-08-27T14:19:36+00:00","dateModified":"2026-10-09T09:40:12+00:00","mainEntityOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/"},"wordCount":366,"publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png","articleSection":["Latest News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/","url":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/","name":"Construction of facilities worth \u20ac720,000 completed in July - CEDIS - Crnogorski elektrodistributivni sistem","isPartOf":{"@id":"https:\/\/cedis.me\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#primaryimage"},"image":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#primaryimage"},"thumbnailUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png","datePublished":"2018-08-27T14:19:36+00:00","dateModified":"2026-10-09T09:40:12+00:00","breadcrumb":{"@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#primaryimage","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/03\/1-3.png","width":872,"height":623},{"@type":"BreadcrumbList","@id":"https:\/\/cedis.me\/en\/latest-news\/construction-of-facilities-worth-e720000-completed-in-july\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cedis.me\/en\/"},{"@type":"ListItem","position":2,"name":"Construction of facilities worth \u20ac720,000 completed in July"}]},{"@type":"WebSite","@id":"https:\/\/cedis.me\/en\/#website","url":"https:\/\/cedis.me\/en\/","name":"CEDIS - Crnogorski elektrodistributivni sistem","description":"Energija u srcu","publisher":{"@id":"https:\/\/cedis.me\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cedis.me\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cedis.me\/en\/#organization","name":"CEDIS - Crnogorski elektrodistributivni sistem","url":"https:\/\/cedis.me\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/","url":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","contentUrl":"https:\/\/cedis.me\/wp-content\/uploads\/2025\/02\/Untitled-1.png","width":1247,"height":492,"caption":"CEDIS - Crnogorski elektrodistributivni sistem"},"image":{"@id":"https:\/\/cedis.me\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cedis.me\/en\/#\/schema\/person\/8d6cf1ba961e9ef20e7a745f4ccc44e8","name":"armin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/514638904f8ebf334297a0f52607fe1863b96c4fc41b47765b39810d9688b6af?s=96&d=mm&r=g","caption":"armin"},"sameAs":["http:\/\/cedis.web"],"url":"https:\/\/cedis.me\/en\/author\/armin\/"}]}},"_links":{"self":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/comments?post=9288"}],"version-history":[{"count":0,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/posts\/9288\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media\/1811"}],"wp:attachment":[{"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/media?parent=9288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/categories?post=9288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cedis.me\/en\/wp-json\/wp\/v2\/tags?post=9288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}