In November, users of the electricity distribution system consumed a total of 223.983.471 kWh of electricity, around 12 per cent more than in October and five per cent more than the energy consumed during the same period of the previous year. The largest amount of electricity, around 38 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi and Cetinje (Region 2).

A total of 404.492 meters were read, or 94 per cent of the total number (the unread metering points are located in buildings that are not permanently occupied). The meter-reading rate at metering points equipped with new electronic meters is 99 per cent.
In November, teams from the Maintenance Sector carried out 2.108 field interventions at the 10/0.4 kV level. The value of maintenance works on electricity facilities (10/0.4 kV) amounted to around 266 thousand euros.
A total of 514 new users were connected to the distribution network in November.
During the previous month, work was carried out to install reclosers and sectionalizers on eight 10 kV overhead lines in Kolašin and Bijelo Polje (“Gornja Morča”, “Rovca”, “Skrbuša”, “Tomaševo”, “Gubavač”, “Rasovo”, “Ivanje” and “Sređevac”). CEDIS allocated around 830 thousand euros for the implementation of this project. Upon completion of the works, users supplied by the aforementioned overhead lines can expect an improvement in the quality of electricity supply.
During November, 26 new electronic meters were installed across Montenegro. The total number of metering points in Montenegro equipped with remotely controlled electronic meters is around 339 thousand, covering approximately 80 per cent of the consumption area.
CEDIS’s core activities are the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 430 thousand users across Montenegro.