In August, electricity distribution system users consumed a total of 271,112,200 kWh of electricity, matching July’s consumption and representing a three per cent increase compared to the electricity consumed during the same period last year. The largest amount of electricity, around 34 per cent, was distributed to users in the areas of Podgorica, Danilovgrad, Tuzi, Zeta and Cetinje (Region 2).
A total of 403,574 meters were read, or 94 per cent of the total number (unread metering points are located in buildings that are not permanently occupied). The meter-reading rate at metering points equipped with new electronic meters is 99 per cent.
In August, the Maintenance Sector teams carried out 2,249 field interventions. The value of works to maintain electricity infrastructure amounted to around 186 thousand euros.
In August, 554 new users were connected to the distribution network.
In August, works valued at 145 thousand euros were carried out on the construction of the “Konik – Stari Aerodrom III” substation. During the same period, public procurement procedures were under way for nine projects estimated to be worth around 837 thousand euros, with the largest share of funds allocated to the construction of the 10/0.4 kV “Nova 4” substation and its connecting 10 kV line, in the Municipality of Podgorica.
Last month, 204 new electronic meters were installed across Montenegro. The total number of metering points in Montenegro equipped with remotely managed electronic meters is around 339 thousand, covering around 80 per cent of the customer base.
CEDIS’s core activity is the distribution of electricity and the construction and maintenance of distribution facilities and the network. CEDIS distributes electricity to around 428 thousand users across Montenegro.